Skip to content
Monday – Friday: 8 a.m. – 4 p.m.C-33 Painting and Decorating contractor · HI License no. 000000VerifyLead-Safe Certified Firm (RRP) · US Firm # 000000VerifyGeneral liability insuranceWorkers' compensation coverage
3 more licenses
  • C-33 Painting and Decorating contractor · HI License no. 000000Verify
  • Lead-Safe Certified Firm (RRP) · US Firm # 000000Verify
  • General liability insurance
  • Workers' compensation coverage
Night foreman(808) 555-0105

Storefront and retail painting · Honolulu

Your storefront, repainted while the shop is closed

Our crews arrive when your doors lock and plan the work backward from the hour you open. Trade-wind salt, sun and rain are part of every prep step.

  • Night crews
  • Salt-air prep
  • Written plan first
A painter cutting in around a door frame in an empty room lit by a work lamp

The night schedule

One night on your storefront, hour by hour

We plan the job backward from the hour you open. These times fit a shop that closes at 9 and opens at 10; yours come from your hours.

  1. Closing

    Step 1: We walk it with you

    The foreman and your closing manager look at the front together: what stays covered, where the cans sit, who locks up.

  2. 9:30 p.m.

    Step 2: Mask, cover and tape

    Sidewalk, glass, signs, door hardware, plants and awning fabric are covered before a brush opens.

  3. 10 p.m.

    Step 3: Rinse, scrape and sand

    A fresh-water rinse for the salt, then loose paint scraped to sound edges with a vacuum on the tool.

  4. Midnight

    Step 4: Treat rust, prime, caulk

    Rust is treated, bare metal and patches are primed and seams are caulked. Primer gets time to cure before the finish.

  5. 2 a.m.

    Step 5: Finish coats

    Two coats of finish on each surface, the second after the first has dried enough to recoat.

  6. Before you open

    Step 6: Clear the front

    Tape comes off, wet-paint signs go up where needed, the sidewalk is swept and the opener gets a walk-through.

Dry times depend on the paint and the night's humidity; the plan names what to leave alone.

Salt-air prep

What salt does to paint, and what we do first

On a shoreline block, paint fails at edges, seams and fasteners first. Prep goes there, before any finish coat.

Gray cedar shingle wall with peeling white trim and a window, with the sea behind it
  1. 1

    Rinse the salt off

    Fresh water, then time to dry. Salt left behind lifts new paint.

  2. 2

    Scrape to sound paint

    Loose and blistered paint comes off back to a firm edge.

  3. 3

    Treat rust, prime bare metal

    Rust is removed or converted and the bare spot primed the same night.

  4. 4

    Caulk seams and joints

    Where trim meets wall and where boards meet, so water doesn't ride in.

  5. 5

    Coat for the coast

    A finish chosen for sun, salt and rain. The data sheet names it.

What we repaint

Fronts, shop floors, gates and common areas

Four kinds of job, all planned around when the doors are shut.

  • Cream painted cornice and decorative band on the corner of a commercial building

    Storefronts

    Walls, doors, trim, cornices and awning frames.

    Storefronts
  • Aluminum stepladder against a wall painted half white and half deep blue

    Shop interiors

    Walls, ceilings and fixtures, one wall or the whole floor.

    Shop interiors
  • Close-up of flaking white paint over orange rust on a weathered metal surface

    Gates, rails and metal

    Security gates, roll-up doors, stair and lanai rails.

    Salt-air prep
  • Covered walkway with white painted walls and arched openings onto a courtyard, a door at the far end

    Condo common areas

    Hallways, stairs, lobbies and walkways, in the hours residents are asleep or out.

    Condo boards

Day or night

Painting by night, and what it changes

Night work suits shops that can't close for a day. It isn't free of tradeoffs, so here is both sides.

Painting by night, and what it changes
DaytimeOvernight
CustomersDaytimeDoors stay open, or the shop closes for the dayOvernightNo one at the door while we work
Sidewalk and entryDaytimeShared with customers and deliveriesOvernightCleared and covered after closing
WeatherDaytimeHot wall in full sun, and rain can still move a dayOvernightCooler and less direct sun on the wall; rain can still move a night
CostDaytimeUsually lower per hourOvernightNight labor is priced on its own line
NeighborsDaytimeNormal daytime noiseOvernightQuiet tools after dark and a plan for upstairs units
ReopeningDaytimeWet-paint signs while customers come and goOvernightFront is cleared and walked before you open

On file

What we can put in your hands before the first night

Landlords, boards and managers ask for these. Ask and we send them with the plan.

  • License and registration

    • C-33 Painting and Decorating contractorVerify

      HI License no. 000000 · Hawaii Contractors License Board

      Can contract for painting and decorating work in Hawaii.

    • Lead-Safe Certified Firm (RRP)Verify

      US Firm # 000000 · U.S. EPA

      The federal rule for paid work that disturbs paint in homes and child-occupied buildings built before 1978.

  • Insurance

    • General liability insurance

      A certificate of insurance, with your building named as certificate holder, comes before the first night.

    • Workers' compensation coverage

      Covers the crew on your site. The certificate comes with the same packet.

  • Documents for your file

    • Certificate of insurance

      Your building named as certificate holder.

    • Sample night plan

      One finished plan: hours, key and alarm contact, covered areas and handback.

    • Resident or tenant notice

      A one-page notice for the day before work starts.

Who comes

The people on your night plan

A small crew of about twelve. These three are on every plan.

  • Fumiko Tamashiro

    Owner and estimator

    (808) 555-0104

    Walks every storefront before a plan is written, and signs it.

  • Jayson Soriano

    Night foreman

    (808) 555-0105

    Runs the crew on site and answers the night line.

  • Divina Dumlao

    Prep lead

    Owns the wash, scrape, rust and primer steps on every job.

Sample comments

What shop owners and boards say

“We close at nine and the front was masked before we'd counted the till. The sidewalk was clear when I unlocked, and the sign told people where the paint was still soft.”

Wing K.Cafe owner

“The estimate had a separate line for night work and another for rust on the roll-up door. I could see what I was paying for.”

Jenifer M.Boutique owner

“Residents got a notice the day before and the walkway rails were done in three nights. The foreman picked up when a neighbor called at one in the morning.”

Tetsuya S.Condo board president

Sample reviews.

Oahu, south shore

Honolulu shops and the blocks around them

Most of our work is on the south shore, from Punchbowl to the airport side. If your block is not listed, send the address and we will say.

Gray stucco wall with a curved parapet and two palm trunks against the sky

Downtown and the valleys

  • Honolulu
  • Chinatown
  • Iwilei
  • Kapalama
  • Kamehameha Heights
  • Punchbowl

Airport side and Pearl Harbor

  • Mapunapuna
  • Sand Island
  • Halawa
  • Aliamanu
  • Foster Village
  • Waimalu

We work on Oahu only. We don't take jobs on the other islands.

Questions

Before you ask us to walk it

Will we be able to open on time?

The plan is built backward from the hour you open. It names which surfaces are dry enough to use, which stay behind wet-paint signs, and who walks the front with your opener. If a night is lost to rain, we tell you before you open, not after.

Does night work cost more?

It can. Crews working nights are paid differently, and the estimate says so in a line of its own, so you can compare it with a daytime price.

What happens when it rains?

We don't paint wet or salt-damp surfaces. Rain moves a night; it doesn't shorten the prep. The plan lists the nights we hold and who calls you.

Who is on site at night, and who do I call?

A foreman and crew, named on the plan. The night foreman's number is on the plan, and he answers it while the crew is on site. The office answers by day.

My building was built before 1978. Does that change anything?

Yes. EPA's Renovation, Repair and Painting rule applies to paid work that disturbs paint in homes and child-occupied buildings built before 1978. Tell us the year; the firm number is in the footer. Most shops are not child-occupied, but a school, a daycare or a home above a shop may be.

What does the estimate include, and what is extra?

It lists surfaces, repairs, coats, products and sheens, colors, protection, night schedule, cleanup and payments. Rot, failed substrate or extra colors found after the old paint comes off are written up and priced before we continue.

Walk-through

Tell us when you close

Send the basics and the foreman will call to set a walk-through at a time your staff can be there. Tell us if the building was built before 1978.

Crews work nights; the office answers by day.